Guild Street Development Update May 2020

May 29, 2020 | Richmond Urban Plan, RR&BA

Dear RRBA & Local Community

A Water Engineer has today inspected the silt fences located around the perimeter of the site to control rainwater runoff and once we have received the Council’s final approval of these works, the earthworks will commence.  We expect earthmoving machinery to start cutting high points and filling low points tomorrow (Wed 27 May) or at least before the end of this week.  There will be noise as trucks deliver and unload hardfill and excavators load up trucks and trailers for material to be taken away.  Subject to weather and ground conditions, the bulk earthworks will continue for between 6 and 8 weeks.  The Stapletons Road site entrance will be used for these operations and this entrance will be the main entrance during the construction period only.      

Whilst the site will not be operational outside Council permitted times (7am to 6pm Monday to Fridays and 8am to 6pm Saturday), trucks transporting the homes from Linwood Park are required to be on the roads in the early hours of the morning when there is less traffic.  The first two relocatable homes are scheduled to be delivered to the site, most likely via Hills Road, Dudley Street then Stapletons Road, early July – NZTA will need to approve the route and transport times.  The remaining nine pairs of home deliveries (larger homes require 2 transporter trucks and trailers) are scheduled to be transported to site during the month of July.  Once the trucks and trailers are on site, their engines will be turned off and work to lift them onto the foundations will resume from 7am.

Please accept our apologies for the noise that will be emitted from the site and for any inconvenience.  We will send further updates during the construction period and we are always happy to answer any questions.

Kind regards

David

David Kolien

Senior Project Manager

Rangzen-logo-small

Rangzen Projects Limited

m:  027 226 8375

Pop Along and have your say

Roadworks Update for Nicholls Street 9

Roadworks Update for Nicholls Street 9

Traffic: Traffic on both Nicholls Street and Dudley street are set up as one-way, and no entry permitted on North Avon Road and Stapleton Road. Inconvenience: Property access including residents on East side of Nicholls st. We plan to do a kerb pour on Thurs, 4/4/24....

read more
Roadworks Update for Nicholls Street 8

Roadworks Update for Nicholls Street 8

Traffic: Traffic on both Nicholls Street and Dudley street are set up as one-way, and no entry permitted on North Avon Road and Stapleton Road. Inconvenience: Property access including residents on East side of Nicholls st. We plan to do a kerb pour on Wed, 27/03/24....

read more
Richmond Village Shopping Centre Pot Holes Fixed

Richmond Village Shopping Centre Pot Holes Fixed

After years of We are Richmond lobbying to get the Richmond Village Carpark restored to a usable standard, the potholes and damage have finally been patch-fixed by one of multiple landlords. Multiple residents and shoppers complained about the safety of this shopping...

read more
Committee Member Hayley Guglietta Receives Civic Award

Committee Member Hayley Guglietta Receives Civic Award

In December last year, We are Richmond Committee Member and extremely active community activator Hayley Guglietta was nominated for a Civic Award.  We can't think of anyone more deserving of this Civic Award. We are Richmond/ Richmond Residents' and Business...

read more