Petrie Street Repair Update Week 4

Week four sees us getting closer to the end of the street with the Stormwater drainage. The final 80 metres of this pipeline is reinforced concrete so this takes a bit longer as there’s some added detailing involved and concrete pouring around the pipe. Nevertheless, we expect to be down to the last 20m stretch by Friday.
Our behind kerb streetscape crew are busy removing the existing infrastructure and they’re working towards reinstating the first new kerb, planned for Friday.
If you have any concerns about parking, deliveries you may be expecting or access/egress issues please see our STMS. Our STMS is the team member in the Green Hi-Vis. He or she will address any of to your concerns
| Week 4: | |||
| Important dates | Activity | Impact to residents | Affected households |
| Monday, 13 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
| Kerb & Footpath Removal | |||
| Tuesday, 14 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
| Kerb & Footpath Removal | |||
| Wednesday, 15 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
| Kerb & Footpath Removal | |||
| Thursday, 16 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
| Kerb & Footpath Removal | |||
| Friday, 17 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
| Two Concrete Pours | |||
| Kerb & Footpath Removal |
Take a look at what is happening around Richmond
Red Zone Edge Housing Forum
At the Red Zone Housing Forum, guest speakers covered future Red Zone housing topics, then those attending wrote down what should and shouldn’t be in the Red Zone edge housing areas.
Mother of All Cleanups River Cleanup
Another amazing Mother of All Cleanups along the Avon River. Volunteers from all over came together to clean the river and gather at Riverlution afterwards.
Pickup and Plant at Pareaway Banks Avenue School Entrance
This school walkway at the Northern entrance of Pareawa Banks Avenue School needs tidying. So we ran a working bee!
RedZone Dogs Richmond Walking with The Walking Festival
We co-hosted a dogs walk with Red Zone Dogs, part of The Walking Festival. Get in touch if you want to join their dog walks!