Petrie Street Repair Update Week 4

Week four sees us getting closer to the end of the street with the Stormwater drainage. The final 80 metres of this pipeline is reinforced concrete so this takes a bit longer as there’s some added detailing involved and concrete pouring around the pipe. Nevertheless, we expect to be down to the last 20m stretch by Friday.
Our behind kerb streetscape crew are busy removing the existing infrastructure and they’re working towards reinstating the first new kerb, planned for Friday.
If you have any concerns about parking, deliveries you may be expecting or access/egress issues please see our STMS. Our STMS is the team member in the Green Hi-Vis. He or she will address any of to your concerns
Week 4: | |||
Important dates | Activity | Impact to residents | Affected households |
Monday, 13 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
Kerb & Footpath Removal | |||
Tuesday, 14 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
Kerb & Footpath Removal | |||
Wednesday, 15 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
Kerb & Footpath Removal | |||
Thursday, 16 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
Kerb & Footpath Removal | |||
Friday, 17 June 2022 | New 300mm Underchannel Stormwater Pipe | One Way system Northbound between North Avon and Randall. Driveway access maintained throughout | All Residents |
Two Concrete Pours | |||
Kerb & Footpath Removal |

Take a look at what is happening around Richmond
Elmer Elephant Trail Opening Event for Laura Fergusson Brain Injury Trust
The RRBA were honoured to attend Elmer’s Ōtautahi Elephant Trail opening Thursday night and see all of the amazing elephant designs.
RRBA Seeks Local Graphic Designer
If you are a graphic designer living in the Richmond area, please get in touch!
Spring Fair 2023 Was a Success!
The RRBA had a fabulous day helping run the Spring Fair alongside Avebury House and Richmond Community Garden. They helped activate the children’s play area and also interacted with the public at their infomation stall.
The Critic Sports Bar Opening at Richmond Club, The Borough
The RRBA were honoured to attend Elmer’s Ōtautahi Elephant Trail opening Thursday night and see all of the amazing elephant designs.