Roadworks Update for Nicholls Street 19

Finally, we hit the big milestone. Nicholls Street is now sealed! Thanks for all your patience and efforts to cooperate with our work.
Now, to ensure the longevity and quality of our new surface, we kindly need your support by following the guidelines below:
- Avoid Sharp Turns and Hard Braking: Abrupt maneuvers can dislodge the chips. Please drive smoothly and avoid sudden stops or sharp turns.
- Be Mindful of Parking: If you park on the street during weekend, do so carefully. Avoid turning your wheels while stationary as this can damage the surface. Steering while stationary can peel the seal off immediately.
- Drive Slowly and Carefully: For the next two weeks, please reduce your speed when driving on the new chipseal. This will help the chips settle properly and reduce the risk of damage.
Please be noted that we will constantly change the traffic set up in one way to allow traffic on different path and compress evenly to the new seal.
Next week, we will carry on Nicholls street footpath work on the West side. On Dudley street, we will continue Stormwater work and starts kerb work on the south side between Nicholls and Stapleton Road.
Residents on Dudley Street should find a letter drop done today for road closure starts on next Friday. We will have road closure set up in sections, the first section will be between Nicholl street and Stapleton Road.
Residents affected we will cooperate our best for your access, but we do encourage you to leave by 8am and come back after 5pm, any emergency or service cars can still come through. If you have any question, please contact our site supervisor, Kane, 021830670.
Traffic:
• Nicholls Street, one way at all time, no entry permitted from North Avon Road . Live footpath is on the east side of Nicholls street.
• Dudley street, one way, no entry permitted on Stapleton Road. (10/6-13/6,Mon-Thurs). Live footpath is on the North side of Dudley street.
• Dudley street, Road closure between Nicholl street and Stapleton Road (14/6, Fri), remaining of Dudley street keeps one way.
Inconvenience:
• On Nicholls Street, Carriageway excavation Footpath construction on Nichols street West side, active communication will be given the day before to residence that will be affected.
• SW main trenching on south side of Dudley street, between Nicholls st and Slater street, active communication will be done daily if passing your driveway.
• Site investigation work on Dudley Street will produce significant noise when the large air vac is in operation.
Site contact person:
Kane Radcliffe, Site supervisor, M:021 830 670
Take a look at what is happening around Richmond
Richmond Gala 2025
So much fun at Richmond Gala! Co-hosted with Avebury House and Richmond Community Garden, the Children’s Play Area (facilitated by We are Richmond) is always popular in Avebury Park.
Petrie Park BBQ and Consultation 2025
We hosted a BBQ for Petrie Park and an open consultation for the planting plan.
Te Oraka Community Pools Co-Hosted Cleanup 1
Volunteers from different Shirley, Richmond and Dallington had a first cleanup session at Te Oraka Community Pools
Walking Weedathon 4
A multi-area walking Weedathon around the streets of Richmond!
Warden Street School Alleyway Cleanup Session 1
A big cleanout for an overgrown school entrance that was abandoned for over a decade on Warden Street, Richmond.
Petrie Park Mural Painting Event 3
Our second Petrie Park mural painting day with the community was a success, and even the dogs came along!