Guild Street Development Update May 2020

May 29, 2020 | Richmond Urban Plan, RR&BA

Dear RRBA & Local Community

A Water Engineer has today inspected the silt fences located around the perimeter of the site to control rainwater runoff and once we have received the Council’s final approval of these works, the earthworks will commence.  We expect earthmoving machinery to start cutting high points and filling low points tomorrow (Wed 27 May) or at least before the end of this week.  There will be noise as trucks deliver and unload hardfill and excavators load up trucks and trailers for material to be taken away.  Subject to weather and ground conditions, the bulk earthworks will continue for between 6 and 8 weeks.  The Stapletons Road site entrance will be used for these operations and this entrance will be the main entrance during the construction period only.      

Whilst the site will not be operational outside Council permitted times (7am to 6pm Monday to Fridays and 8am to 6pm Saturday), trucks transporting the homes from Linwood Park are required to be on the roads in the early hours of the morning when there is less traffic.  The first two relocatable homes are scheduled to be delivered to the site, most likely via Hills Road, Dudley Street then Stapletons Road, early July – NZTA will need to approve the route and transport times.  The remaining nine pairs of home deliveries (larger homes require 2 transporter trucks and trailers) are scheduled to be transported to site during the month of July.  Once the trucks and trailers are on site, their engines will be turned off and work to lift them onto the foundations will resume from 7am.

Please accept our apologies for the noise that will be emitted from the site and for any inconvenience.  We will send further updates during the construction period and we are always happy to answer any questions.

Kind regards

David

David Kolien

Senior Project Manager

Rangzen-logo-small

Rangzen Projects Limited

m:  027 226 8375

Pop Along and have your say

Chrystal Street Repair Update Week 5

Chrystal Street Repair Update Week 5

Week 5 Chrystal Street work plan and the key dates and impact below. Information provided by the Isaacs project manager. We appreciate that everyone has put up with the inconvenience caused by the construction. We are glad to see the new road configuration start to...

read more
Richmond Road Repair Update

Richmond Road Repair Update

Since a fiery meeting attended by residents and Council staff in 2018, the Richmond Residents’ and Business Association has been collaborating with the City Council with the aim of establishing a step-by-step road repair programme and general upgrade of Richmond...

read more
Methodist Mission Social Housing Units in Guild St

Methodist Mission Social Housing Units in Guild St

There are now 11 homes tenanted with more tenants moving in soon. Currently there are 42 people living at the complex. The Methodist Mission Social Housing staff want to pass on their thanks to the local community for the way they have largely made the new residents...

read more