Guild Street Development Update May 2020

May 29, 2020 | Richmond Urban Plan, RR&BA

Dear RRBA & Local Community

A Water Engineer has today inspected the silt fences located around the perimeter of the site to control rainwater runoff and once we have received the Council’s final approval of these works, the earthworks will commence.  We expect earthmoving machinery to start cutting high points and filling low points tomorrow (Wed 27 May) or at least before the end of this week.  There will be noise as trucks deliver and unload hardfill and excavators load up trucks and trailers for material to be taken away.  Subject to weather and ground conditions, the bulk earthworks will continue for between 6 and 8 weeks.  The Stapletons Road site entrance will be used for these operations and this entrance will be the main entrance during the construction period only.      

Whilst the site will not be operational outside Council permitted times (7am to 6pm Monday to Fridays and 8am to 6pm Saturday), trucks transporting the homes from Linwood Park are required to be on the roads in the early hours of the morning when there is less traffic.  The first two relocatable homes are scheduled to be delivered to the site, most likely via Hills Road, Dudley Street then Stapletons Road, early July – NZTA will need to approve the route and transport times.  The remaining nine pairs of home deliveries (larger homes require 2 transporter trucks and trailers) are scheduled to be transported to site during the month of July.  Once the trucks and trailers are on site, their engines will be turned off and work to lift them onto the foundations will resume from 7am.

Please accept our apologies for the noise that will be emitted from the site and for any inconvenience.  We will send further updates during the construction period and we are always happy to answer any questions.

Kind regards

David

David Kolien

Senior Project Manager

Rangzen-logo-small

Rangzen Projects Limited

m:  027 226 8375

Pop Along and have your say

Roadworks Update for Nicholls Street 26

Roadworks Update for Nicholls Street 26

As you can see, new hydroseeding and nursery plants and trees have been planted on Nicholls Street. The greenery is making Nicholls Street look lovely, so let's protect it by avoiding stepping on it. With Dudley Street under road closure, we will assist with your...

read more
Roadworks Update for Nicholls Street 25

Roadworks Update for Nicholls Street 25

By the end of next week, all landscape work on Nicholls Street should be completed, weather permitting. We are scheduled to pour the kerb on Thursday, 25/07/2024. Residents at 39, 41, 43, 47, and 51 Dudley Street, please move your vehicles by 7am. If you have any gas...

read more
Roadworks Update for Nicholls Street 24

Roadworks Update for Nicholls Street 24

We have landscaping works happening on Nicholls Street. If we could please avoid parking cars and walking on the berms.   15/07/24 - 19/07/24 (Mon- Fri) •Nicholls Street is open to residents with two lanes. Residents can enter/exit from North Avon Road. •Please...

read more