Roadworks Update for Nicholls Street 23

We’ve made significant progress thanks to a break in the weather after a month of rain. We began sealing the footpaths last Thursday, and both sides should be sealed by the end of Tuesday, 09/07/24. Following this, there will be major traffic management changes on both streets. The topsoil is still quite fresh at the moment. I know it looks fluffy, but please avoid leaving footprints on it at this stage. Thanks for your cooperation.
Starting Wednesday, 10/07/24, Nicholls Street will open to two-lane traffic, allowing residents to enter and exit from North Avon Road. The landscaping crew will continue working on both sides of Nicholls Street, which may require pedestrian escorts or shoulder closures. Road sweeping may also occur this week, so please drive carefully.
We will be closing Dudley Street between Slater Street and Stapletons Road. If residents living on Dudley Street need daytime urgent access to Dudley Street, please approach from Nicholls Street, where a full-time Traffic Controller will assist you. However, please note that driving on a closed road may void your insurance in case of damage. You can alternatively park nearby and use the footpath on the north side between the trees and fences on Dudley Street.
We plan to pour the kerb between Nicholls Street and Slater Street (south side) on Wednesday, 10/07/24. Residents at 30, 32, and 34 Dudley Street, please move your vehicles by 7 AM. Driveway access will be restored by 5.30 PM.
Traffic:
08/07/24 – 09/07/24 (Mon – Tues)
• Road closure on Dudley street between Nicholls Street and Stapleton Road and will return to one-way traffic after 5:30 PM.
• One-way entry from Slater Street, NO entry from North Avon Road
10/07/24 – 12/07/24 (Wed – Fri)
• Nicholls Street will be open to residents with two lanes. Residents can enter/exit from North Avon Road.
• Please be mindful of landscaping crews working on the street and footpath.
• Dudley Street will be completely closed from 7:00 AM to 5:30 PM and will return to one-way traffic after 5:30 PM. We will try our best to accommodate residents on Dudley Street.
If you need daytime access, please approach from Nicholls Street, where a full-time Traffic Controller will be available to assist you.
• Site investigation work on Dudley Street will produce significant noise when the large air vac is in operation.
• Kerb pouring on Wednesday, weather permitting, 10/07/24, between Slater Street and Nicholls Street on the south side.
Site contact person:
Kane Radcliffe, Site supervisor, M:021 830 670
Take a look at what is happening around Richmond
Laura Fergusson Brain Injury Trust Groundbreaking Ceremony
Welcome Laura Fergusson Brain Injury Trust to our wider communities. We are excited for your presence in our area.
Te Oraka Community Pools Co-Hosted Fence Removal
Volunteers were back, from different Shirley, Richmond and Dallington groups to remove the Te Oraka Community Pool fence. Kai Pai!
Matariki Decoration Session 2
Second of two workshops to make fabric decorations for our Ururangi tree, celebrating Matariki.
Matariki Decoration Session 1
One of two workshops to make fabric decorations for our Ururangi tree, celebrating Matariki.
History Posters Installed/ Parklet Tidied Stanmore Rd
Finally we have installed the History Panels we have wanted on the corner of Swanns and Stanmore Rd for years. After a proper tidy up a year ago, look at it now!
Adventure Avenue Wander 2025
A wander through the forest and gardens around Richmond and Dallington Red Zone, guided by Hayley Guglietta of Avon Otakaro Network, hosted by We are Richmond.





