Roadworks Update for Nicholls Street 24

We have landscaping works happening on Nicholls Street. If we could please avoid parking cars and walking on the berms.
15/07/24 – 19/07/24 (Mon- Fri)
•Nicholls Street is open to residents with two lanes. Residents can enter/exit from North Avon Road.
•Please be mindful of landscaping crews working on the street and footpath.
•Dudley Street will be completely closed from 7:00 AM to 5:30 PM and will return to one-way traffic after 5:30 PM. We will try our best to accommodate residents on Dudley Street.
If you need daytime access, please approach from Nicholls Street, where a full-time Traffic Controller will be available to assist you.
•Footpath and driveway prepping on the south side between Nicholls Street and Stapletons Road.
•Kerb&Channel prepping on the North side between Nicholls Street and Stapletons Road.’
•Sump & Stormwater installation by Slater Street end.
Site contact person:
Kane Radcliffe, Site supervisor, M:021 830 670
Take a look at what is happening around Richmond
Petrie Park BBQ and Consultation 2025
We hosted a BBQ for Petrie Park and an open consultation for the planting plan.
Te Oraka Community Pools Co-Hosted Cleanup 1
Volunteers from different Shirley, Richmond and Dallington had a first cleanup session at Te Oraka Community Pools
Warden Street School Alleyway Cleanup Session 1
A big cleanout for an overgrown school entrance that was abandoned for over a decade on Warden Street, Richmond.
Petrie Park Mural Painting Event 3
Our second Petrie Park mural painting day with the community was a success, and even the dogs came along!
Petrie Park Mural Painting Event 2
Our second Petrie Park mural painting day with the community was a success, and even the dogs came along!
Petrie Park Mural Painting Event I
We had our first mural painting day with the community and it was a success!





